Time | Activity |
12.30 pm | - Go to the site |
1.00 pm | - Set up glulam structure + scott’s cable + Jin’s rope (Attach the hinges, connect the arches, put on supporting metal cables and ropes) * Safety harness and appropriate clothing will be necessary (anti slip mat may be required) - Set up sound and lighting systems * Safety of the public need to be taken care of (staircase will be heavily used during installments) - Assemble the plastics sheet into one “blanket” * Plastics sheets first needs to be merged with each other - 4 sheets combine into 1, using cable ties/ fishing wire weaving?) |
3.00 pm | - Put on the plastics “blanket” onto the glulam structure and secure it |
4.30 pm | - Final check and clean up the mess (Hinges connections, clean up staircase for any possible hazards, sound and lighting systems) |
5.00 pm | - 1st event officially starts |
8.30 pm | - Start packing up; 1). Nets, sound and lighting systems 2). Ropes 3). Disassemble the glulam structure + supporting metal cables 4). Pack everything up and store it in the container 5). Final check on all the equipment (make sure nothing is missing) 6). Lock the container. |
* All these processes will be recorded for design 4 documentation.